Approval for redevelopment of former Family Centre, Cambridge Malta Road, Cambridge
silhouette black man survey and civil engineer stand on ground working in a land building site over Blurred construction worker on construction site.
Client
This Land Ltd
Sector
Planning & Development
Location
Malta Road, Cambridge
How we helped
Financial viability
@
Get in touch
@
Richard Seamark
Partner, Planning & Development
01223 346634 Email me About Richard
PREV:
NEXT:
Architectural rendering of future residential buildings at Malta Road, Cambridge
Malta Road, Cambridge
Architectural rendering of future residential buildings at Malta Road, Cambridge
Malta Road, Cambridge

Working on behalf of This Land Ltd., our planning team in Cambridge, lead by Richard Seamark, secured full planning permission for the redevelopment of a former family centre building.

The scheme received resolution to grant permission at Cambridge City Council’s virtual planning committee, with members voting to endorse the case officer’s recommendation for approval.

The permission was the product of a considerable amount of thought, deliberation and adaptability with our first pre-application submission to the City, followed by a second pre-app meeting a year later, and a series of further discussions and on-going amendments up to, and beyond submission of the application.

The process was not without its challenges, and it was beneficial that we could use our strong professional relationships with the local planning authority to find solutions to various issues raised.

Having gone through an 18-month period of pre-application consultation, a blanket Tree Preservation Order was imposed by the Council only a month after the application was submitted.

There had previously been no concern raised by officers about the loss of trees on the site, on the basis that new planting would occur elsewhere. An objection from the Environmental Health Officer was also subsequently raised, with concerns that noise from a nearby nursery might affect the living conditions of the houses. Again, the issue of noise was not raised at any point during the pre-app process.

Finally, the implications of the Council’s new local plan, relating to policy 51 on accessible homes, were becoming more clearly understood at that point, prompting the need to revise plans once again in order to incorporate lift provision in the apartments, and level access to the townhouses.

The outcome should hopefully be a positive one for Cambridge. It provides the opportunity to redevelop a vacant brownfield site in a sustainable location, with new well-designed housing. It provides a mix of one, two and three bedroom accessible apartments and houses, all with generous levels of internal and external space, covered bin storage, a cycle space for every bedroom on the scheme, a car parking space for each townhouse, and three spaces between the five apartments.

Related Case Studies
Estate Management: Police and Crime Commissioners
Planning & development

Estate Management: Police and Crime Commissioners

Carter Jonas provide a full range of operational property support services across the entirety of th...

View case study
Norwich City Council
Planning & development

Norwich City Council

Norwich City Council is seeking to improve the performance of its portfolio through rationalisation ...

View case study
Brent Cross Cricklewood Regeneration
Planning & development

Brent Cross Cricklewood Regeneration

Carter Jonas advised Hammerson, Standard Life and the London Borough of Barnet in the promotion of C...

View case study
C.H. Robinson Amsterdam Consolidation
Planning & development

C.H. Robinson Amsterdam Consolidation

C.H. Robinson had three sites in Amsterdam which were no longer aligned with the business needs and ...

View case study
The Manor House
Planning & development

The Manor House

The Manor House is an important early 17th Century Grade II* Listed property in North Oxfordshire. C...

View case study
Orchard Lea Pool Complex
Planning & development

Orchard Lea Pool Complex

Carter Jonas were acquired to help with the design and construction of a contemporary 15m x 6m priva...

View case study
Orchard Lea Main House Refurbishment
Planning & development

Orchard Lea Main House Refurbishment

Carter Jonas worked on the total refurbishment, upgrade and extension of a 7-bedroom Edwardian house...

View case study
Premier Inn Hotel
Planning & development

Premier Inn Hotel

Located on a previously unused car park in Newbury’s town centre, this new 100 bed budget hotel with...

View case study
Residential development land sold
Planning & development

Residential development land sold

On a private landowner’s behalf, our northern development team were instructed to identify a suitabl...

View case study
Chalfont St Peter, Aylesbury Vale
Planning & development

Chalfont St Peter, Aylesbury Vale

Our professionals developed indicative masterplan proposals for land northeast of Chalfont St Peter ...

View case study
Cleeve Meadow School
Planning & development

Cleeve Meadow School

Our planning professionals worked with London Borough of Bexley (LBB), Kemnal Academies Trust and Ga...

View case study
Development partner secured, Leeds
Planning & development

Development partner secured, Leeds

Our development professionals were instructed to identify a suitable development partner to take on ...

View case study
Homerton College Development
Planning & development

Homerton College Development

Carter Jonas are instructed by Homerton College to manage the Homerton Business Centre and adjoining...

View case study
Discovery Special Academy
Planning & development

Discovery Special Academy

Our planning specialists secured temporary planning permission for a two year period for modular acc...

View case study
Development partner secured, Manchester
Planning & development

Development partner secured, Manchester

Acting on behalf of a private landowner who owns around 1,000 acres of land within Rochdale Bury, ou...

View case study
Heathside
Planning & development

Heathside

Acting on behalf of the Department for Education and the ElmWey Learning Trust, we secured planning ...

View case study
Aperture Works
Planning & development

Aperture Works

Carter Jonas has successfully secured reserved matters and detailed planning permission for Harrow V...

View case study
Surplus Land Pilot Study
Planning & development

Surplus Land Pilot Study

We are currently advising Homes England and Locat-Ed, the Department for Education’s property compan...

View case study
Nestles Avenue
Planning & development

Nestles Avenue

Carter Jonas was involved in advising Buccleuch Property on a mixed-use redevelopment scheme on Nest...

View case study
Sir John Moore Barracks
Planning & development

Sir John Moore Barracks

Sir John Moore Barracks is the home of the Army Training Regiment and dates from 1986, but the site ...

View case study
Central Abingdon Regeneration Framework (CARF)
Planning & development

Central Abingdon Regeneration Framework (CARF)

Regeneration framework for improvements to the town centre of Abingdon, a town along the River Thame...

View case study
Development land in Harrogate
Planning & development

Development land in Harrogate

Carter Jonas’ development professionals have sold a 5.17-acre development site at Whinney Lane in Ha...

View case study
Ashton Gate Sporting Village
Planning & development

Ashton Gate Sporting Village

Carter Jonas prepared and managed the submission of the financial viability assessment on behalf of ...

View case study
Cleeve Park
Planning & development

Cleeve Park

Working with the London Borough of Bexley (LBB) and the Kemnal Academies Trust, we secured planning ...

View case study
Wycliffe Retirement Village
Planning & development

Wycliffe Retirement Village

Carter Jones secured planning permission on behalf of Salmon Harvester Properties for the redevelopm...

View case study
Beaverbrook Golf Course
Planning & development

Beaverbrook Golf Course

The delivery of this exemplary project was due to many years of hard work by a committed and enthusi...

View case study
Multi-development opportunities in Gillingham
Planning & development

Multi-development opportunities in Gillingham

Carter Jonas acted for a private landowner in respect of a strategic development scheme comprising a...

View case study
North Abingdon, Oxfordshire
Planning & development

North Abingdon, Oxfordshire

Acting for a charity, Carter Jonas identified the potential for development of the client’s Greenbel...

View case study
Brick By Brick Small Sites Portfolio
Planning & development

Brick By Brick Small Sites Portfolio

Carter Jonas is advising a Croydon Council backed development company on a 70-site residential portf...

View case study
Strategic development scheme in Wantage
Planning & development

Strategic development scheme in Wantage

Carter Jonas brought two farming families together at Wantage to promote a strategic development sch...

View case study
Land development opportunities from Greenbelt to the north of Abingdon
Planning & development

Land development opportunities from Greenbelt to the north of Abingdon

Acting for a charity client, Carter Jonas identified the potential for development of Greenbelt land...

View case study
Spencer’s Park
Planning & development

Spencer’s Park

Carter Jonas is advising Homes England on the development of its land at Spencer’s Park, Hemel Hemps...

View case study
Gunnersbury Triangle
Planning & development

Gunnersbury Triangle

We recently secured planning permission, on behalf of Lampton Development 360, a joint venture partn...

View case study
Kingston Riding Centre
Planning & development

Kingston Riding Centre

On behalf of the residential developer London Square Developments, our Carter Jonas London planning ...

View case study
Carter Jonas secures planning permission for the expansion of the Oxfordshire Advanced Skills facility at Culham Science Centre
Planning & development

Carter Jonas secures planning permission for the expansion of the Oxfordshire Advanced Skills facility at Culham Science Centre

Carter Jonas was appointed by the UK Atomic Energy Authority (UKAEA) to prepare and submit a plannin...

View case study
North Brockworth, Gloucestershire
Planning & development

North Brockworth, Gloucestershire

Carter Jonas acquired around 90 acres of agricultural land in the Green Belt near Gloucester for an ...

View case study
Bodicote, Oxfordshire
Planning & development

Bodicote, Oxfordshire

Acting on behalf of a longstanding institutional client, Carter Jonas has sold 43 acres of developme...

View case study
Goldsworth Road, Woking Borough Council
Planning & development

Goldsworth Road, Woking Borough Council

Carter Jonas is advising EcoWorld London on the redevelopment of the 1.15 ha site, comprising eight ...

View case study
Harrods Headquarters
Planning & development

Harrods Headquarters

Carter Jonas’ London planning team has obtained planning permission for a large-scale office extensi...

View case study
Winterbourne Fields
Planning & development

Winterbourne Fields

Development of a new garden village close to Canterbury and Faversham in the Swale Borough of Kent.

View case study
100% affordable housing scheme, York
Planning & development

100% affordable housing scheme, York

Our northern planning team have submitted a full planning application for an 100% affordable housing...

View case study
Westminster Small Sites
Planning & development

Westminster Small Sites

Carter Jonas advised Westminster City Council on the redevelopment of two council-owned garage sites...

View case study
Carter Jonas acquired 90 acres of land in Greenbelt
Planning & development

Carter Jonas acquired 90 acres of land in Greenbelt

Carter Jonas acquired around 90 acres of agricultural land in the Green Belt near Gloucester for an ...

View case study
Charlton Riverside
Planning & development

Charlton Riverside

Carter Jonas is advising Hyde Group on the redevelopment of the 4.21 ha site, comprising five parcel...

View case study
Harrow View East
Planning & development

Harrow View East

Carter Jonas has successfully secured reserved matters and detailed planning permission for Harrow V...

View case study
Rickman’s Green Village
Planning & development

Rickman’s Green Village

Carter Jonas Masterplanning team have submitted an outline application for up to 475 homes on land a...

View case study
Land off Cogges Hill Road
Planning & development

Land off Cogges Hill Road

The Masterplanning team have developed proposals for a major urban extension to the east of Witney i...

View case study
North West Kent College
Planning & development

North West Kent College

A planning application to redevelop an existing college campus located in the Green Belt.

View case study
Fairfield Homes
Planning & development

Fairfield Homes

Carter Jonas was instructed to provide planning strategy advice and prepare a detailed planning appl...

View case study
Brentford Community Stadium
Planning & development

Brentford Community Stadium

We have been working with Brentford Football Club and its development partner EcoWorld London for a ...

View case study
West of Ifield Garden Village
Planning & development

West of Ifield Garden Village

Crawley was a classic 1940’s New Town with 9 distinct neighbourhoods surrounding the urban centre an...

View case study
Ladbroke Grove
Planning & development

Ladbroke Grove

Carter Jonas advise the Royal Borough of Kensington and Chelsea (RBKC) on the redevelopment of its r...

View case study
Land off Thornbury Road, Eynsham
Planning & development

Land off Thornbury Road, Eynsham

Maximised value for the landowner by securing planning permission for 160 residential units and then...

View case study
Hounslow High Street Quarter
Planning & development

Hounslow High Street Quarter

Carter Jonas is advising Barratt London on the redevelopment of a prominent town centre site, north ...

View case study
Roper Rhodes
Planning & development

Roper Rhodes

The South West building consultancy team were appointed in June 2016 to provide a feasibility report...

View case study
Estate Strategy: BCC Property Asset Management Plan
Planning & development

Estate Strategy: BCC Property Asset Management Plan

One of the first activities undertaken following Carter Jonas’ appointment as Estates Framework prov...

View case study
Foxcombe Hall
Planning & development

Foxcombe Hall

Acting on behalf of the Open University, Carter Jonas were instructed to dispose of the university's...

View case study
Care Quality Commission
Planning & development

Care Quality Commission

Care Quality Commission was seeking advice and technical support through the identification of optio...

View case study
Statutory Transfers
Planning & development

Statutory Transfers

Land held within the public sector can be subject to change by way of changes in legislation, The Ac...

View case study
Ingeus Office Acquisition
Planning & development

Ingeus Office Acquisition

Carter Jonas’s team in Leeds identified and acquired suitable premises for Ingeus to open six new of...

View case study
New Travelodge Sites
Planning & development

New Travelodge Sites

Will Mooney, head of the Eastern Region Commercial Department in Cambridge, and Samuel Turner are ap...

View case study
Lease Renewal Services for Feref
Planning & development

Lease Renewal Services for Feref

Instructed to negotiate a renewal of Feref Ltd’s existing lease at 17-18 Great Pulteney Street, W1, ...

View case study
WANO Rent Review
Planning & development

WANO Rent Review

Carter Jonas were instructed to negotiate the rent review of WANO’s office on the 35th floor of 25 C...

View case study
Lime Tree Clinic
Planning & development

Lime Tree Clinic

The Carter Jonas Building Consultancy team was instructed to undertake the refurbishment and extensi...

View case study
Grove Business Park
Planning & development

Grove Business Park

Grove Business Park in Oxfordshire is set in 32 acres of land, offering a range of existing office, ...

View case study
Frost and Sullivan Relocation
Planning & development

Frost and Sullivan Relocation

Carter Jonas were instructed to relocate Frost & Sullivan UK headquarters to new offices capable of ...

View case study
Global Headquarters Cambridge
Planning & development

Global Headquarters Cambridge

Carter Jonas has been appointed by ARM Holdings to act as their sole strategic property adviser in C...

View case study
London Borough of Haringey
Planning & development

London Borough of Haringey

Carter Jonas conducted a Council-wide consultation on a pre-determined section of the London Borough...

View case study
Estate Strategy: RBLI
Planning & development

Estate Strategy: RBLI

Royal British Legion Industries occupies an island site in Aylesford Kent, comprising 70 acres with ...

View case study
Valuation of grammar school
Planning & development

Valuation of grammar school

Acting on behalf of the Haberdashers' Company, our valuation professionals in Birmingham and Oxford ...

View case study
Valuations for Warwick District Council
Planning & development

Valuations for Warwick District Council

Carter Jonas is retained by Warwick District Council to provide asset valuations in respect of Gener...

View case study
Nuffield Industrial Estate
Planning & development

Nuffield Industrial Estate

Acting on behalf of Eskmuir Properties, Carter Jonas were instructed on a joint agency basis to disp...

View case study
Launton Business Centre
Planning & development

Launton Business Centre

Acting on behalf of CBRE GI, Carter Jonas were jointly instructed to market and secure tenants for U...

View case study
Grantchester High Street Lease
Planning & development

Grantchester High Street Lease

Carter Jonas were instructed to advise and dispose of the leasehold interest of a former Car Garage ...

View case study
Abingdon Science Park
Planning & development

Abingdon Science Park

Acting on behalf of Addington Capital, Carter Jonas were retained as sole agents after the previous ...

View case study
King Charles House
Planning & development

King Charles House

Carter Jonas were instructed to market, by way of a sublease, surplus office accommodation occupied ...

View case study
240 Blackfriars, Demandware
Planning & development

240 Blackfriars, Demandware

Following submission and acceptance of a competitive fee proposal, Carter Jonas was appointed by Dem...

View case study
London Relocation Greenlight Marketing
Planning & development

London Relocation Greenlight Marketing

Relocation of a well-known marketing company, Greenlight Marketing, to c. 13,000 sq ft in British La...

View case study
Nursing and Midwifery Council
Planning & development

Nursing and Midwifery Council

Nursing and Midwifery Council was seeking advice and technical support through the identification of...

View case study
Shortgrove Farm
Planning & development

Shortgrove Farm

Situated in the rolling Chiltern Hills, the principal property at Shortgrove Farm dates back to the ...

View case study
Culham Science Centre
Planning & development

Culham Science Centre

Culham Science Centre combines world-class publicly funded research into fusion power; commercial te...

View case study
Sale of Petrol Filling Station Investment
Planning & development

Sale of Petrol Filling Station Investment

Carter Jonas successfully marketed and negotiated the sale of a petrol filling station investment, e...

View case study
Milton Park
Planning & development

Milton Park

Acting on behalf of RM Plc, Carter Jonas acquired new office premises totaling 17,900 sq ft at Milto...

View case study
Worcester College, Oxford
Planning & development

Worcester College, Oxford

In September 2016 the college set up a committee of senior Fellows’ and staff who had been tasked wi...

View case study
Valuation of private dwelling
Planning & development

Valuation of private dwelling

Our professionals advised a traditional private bank which was facilitating the purchase of an impor...

View case study
Harrogate West Business Park
Planning & development

Harrogate West Business Park

Carter Jonas Northern Commercial secures 100% occupation of 111,170 sq ft of new build commercial wa...

View case study
Marrtree Business Park, Thirsk
Planning & development

Marrtree Business Park, Thirsk

Marrtree Business Park forms part of the larger Sowerby Gateway development which extends to some 70...

View case study
Valuation of Handelsbanken portfolio
Planning & development

Valuation of Handelsbanken portfolio

Our professionals in Birmingham have provided valuation advice on an investment portfolio of 15 comm...

View case study
Property Reviews: LB Hounslow
Planning & development

Property Reviews: LB Hounslow

Carter Jonas conducted a property asset review on a pre-determined section of the London Borough of ...

View case study
Freehold Investment Disposal
Planning & development

Freehold Investment Disposal

The Cambridge office of Carter Jonas was at the heart of a commercial property deal which saw the di...

View case study
Old Bond Street
Planning & development

Old Bond Street

5 Old Bond Street occupies a pivotal position on the end of a central terrace in Old Bond Street, ot...

View case study
New Warehouse
Planning & development

New Warehouse

Carter Jonas' Building Consultancy team provided a monitoring service in relation to a £2 million ne...

View case study
Valuation of West End Theatres
Planning & development

Valuation of West End Theatres

Carter Jonas were instructed by an American client to provide an asset valuation for tax purposes af...

View case study
The Maltings Industrial Estate
Planning & development

The Maltings Industrial Estate

Following a reorganisation of their warehouse arrangements, UK bathroom supplier Roper Rhodes releas...

View case study
CIL Relocation
Planning & development

CIL Relocation

Instructed to relocate CIL management consultants to new offices capable of accommodating approximat...

View case study
Czarnikow Office Acquisition
Planning & development

Czarnikow Office Acquisition

Instructed to acquire an office floor within the City of London suitable for accommodating approxima...

View case study
CBS Freehold Disposals
Planning & development

CBS Freehold Disposals

Carter Jonas were instructed to advise and dispose of a number of Cambridge Building Society sites a...

View case study
BP International Business Park
Planning & development

BP International Business Park

Carter Jonas were instructed by Spelthorne Borough Council to provide a valuation for accounts purpo...

View case study
20 Nuffield Way
Planning & development

20 Nuffield Way

Acting on behalf of Opcare Limited, Carter Jonas were instructed to advise on disposal options for a...

View case study
ARM Eastbrook Office Acquisition
Planning & development

ARM Eastbrook Office Acquisition

Carter Jonas’s Cambridge office team were instructed by ARM Ltd to find expansion space for their bu...

View case study
Estate Management: BCC
Planning & development

Estate Management: BCC

Provision of full property support services across the operational and investment estates of Bucking...

View case study
Former St Peter’s School
Planning & development

Former St Peter’s School

On behalf of Wiltshire Council, Carter Jonas were appointed to dispose of the freehold interest in t...

View case study
Land at Darlington Road
Planning & development

Land at Darlington Road

The Carter Jonas Leeds Office have been acting for local farming family, the Gills, since the mid-19...

View case study
The Broers Building
Planning & development

The Broers Building

Carter Jonas are instructed by the University of Cambridge to manage the Broers Building, which is l...

View case study
6 High Street, Ely
Planning & development

6 High Street, Ely

Carter Jonas provided dilapidations advice in respect of the former tenant’s exit and subsequently d...

View case study
Harlow Pitney Bowes
Planning & development

Harlow Pitney Bowes

Carter Jonas were instructed by Pitney Bowes to manage the relocation from a redundant office to a f...

View case study
Pharmaceutical office relocation
Planning & development

Pharmaceutical office relocation

Carter Jonas worked with Oval Medical Ltd on the acquisition and fit-out of a new office and researc...

View case study
Kingston Farm
Planning & development

Kingston Farm

We were appointed as Hitachi’s lead consultant and project manager to procure CAT B fit-out works to...

View case study
Leeds City Centre Office Acquisition
Planning & development

Leeds City Centre Office Acquisition

Carter Jonas identified new premises and negotiated favourable terms for The Medical Protection Soci...

View case study
Estate Strategy: Department for Work and Pensions (DWP)
Planning & development

Estate Strategy: Department for Work and Pensions (DWP)

Re-appointed in November 2016 as the National Property Advisor for Department for Work and Pensions,...

View case study
Ridgeon's Development
Planning & development

Ridgeon's Development

On behalf of Ridgeon’s Builders Merchants Limited, Carter Jonas were appointed to procure a developm...

View case study
Somerville College, Oxford
Planning & development

Somerville College, Oxford

Inspection to establish overall condition for compliance and maintenance of 14no residential propert...

View case study
Property Reviews: BCC Location Asset Strategy Review
Planning & development

Property Reviews: BCC Location Asset Strategy Review

Carter Jonas has provided a full review of all Buckinghamshire County Council property, with a prima...

View case study
Letting of Riverside South
Planning & development

Letting of Riverside South

Carter Jonas were approached by the tenants of Riverside South in order to help advise them on an ex...

View case study
Food Standard Agency (FSA)
Planning & development

Food Standard Agency (FSA)

Food Standard Agency needed to vacate its current London headquarters and relocate, considering vari...

View case study
UK Payments Administration Office Acquisition
Planning & development

UK Payments Administration Office Acquisition

Carter Jonas were instructed to acquire an office floor in close proximity to Thomas More Square, E1...

View case study
Units 18b & 18c Meridian East
Planning & development

Units 18b & 18c Meridian East

Units 18b and 18c are two office buildings within the Meridian East Business Park. They are 10,790 s...

View case study
Stuntney
Planning & development

Stuntney

Working on behalf of our client, Cole Ambrose Ltd., our Planning & Development team, based in the ea...

View case study
Land north of Cambridge Road, Linton
Planning & development

Land north of Cambridge Road, Linton

Carter Jonas has prepared a vision document on behalf of Bloor Homes Ltd in order to promote the sit...

View case study
Approval for 200 homes and open space in Oakham
Planning & development

Approval for 200 homes and open space in Oakham

The Masterplanning team was initially instructed to produce a vision document to support the promoti...

View case study
Waterbeach New Town East
Planning & development

Waterbeach New Town East

Carter Jonas prepared and managed the submission of the financial viability assessment on behalf of ...

View case study
Threesixty Developments
Planning & development

Threesixty Developments

Threesixty Developments called on Carter Jonas’s expertise following the refusal of a planning appli...

View case study
Planning Permission secured on appeal for retirement village in the Cambridge Green Belt
Planning & development

Planning Permission secured on appeal for retirement village in the Cambridge Green Belt

Acting on behalf of Axis Land Partnerships Ltd, the Carter Jonas Eastern Planning Team has secured o...

View case study
India House, Cambridge
Planning & development

India House, Cambridge

On this project, Carter Jonas provided planning consultancy services from inception to completion of...

View case study
Land at Panshanger, Hertfordshire
Planning & development

Land at Panshanger, Hertfordshire

Our professionals provided a development appraisal and valuation of a former aerodrome site at Pansh...

View case study
Carter Jonas achieves planning consent for Barratt and David Wilson homes in Cambridge
Planning & development

Carter Jonas achieves planning consent for Barratt and David Wilson homes in Cambridge

National property consultancy Carter Jonas has secured planning consent on behalf of Barratt and Dav...

View case study
Buchan Street Local Centre
Planning & development

Buchan Street Local Centre

Our planning consultants successfully secured a resolution to approve a planning application for the...

View case study
West Tey
Planning & development

West Tey

On behalf of L&Q, as well as strategic promoters Cirrus Land and landowner consortium G120, Carter J...

View case study
Cambridge Growing Life Centre
Planning & development

Cambridge Growing Life Centre

Carter Jonas’s Cambridge Planning Team assisted Granta Park Estates in securing planning permission ...

View case study
Cambridge Southern Fringe
Planning & development

Cambridge Southern Fringe

The Cambridge Southern Fringe Area Development Framework (2006) formed the blueprint for the ongoing...

View case study
Land East of Roman’s Edge, Godmanchester
Planning & development

Land East of Roman’s Edge, Godmanchester

The Carter Jonas Masterplanning team prepared a vision document for Plaza Land Limited to help promo...

View case study
Epping Town Centre Sites
Planning & development

Epping Town Centre Sites

Carter Jonas prepared and managed the submission of the financial viability assessment on behalf of ...

View case study
ARM Holdings Campus Expansion
Planning & development

ARM Holdings Campus Expansion

Carter Jonas’ Cambridge Planning team helped secure detailed planning permission for 20,677sqm GEA o...

View case study